Reset

Hornby R40498 OO LNER Mk4 TSOE 12223 B Coach
HORNBY
Hornby R40498 OO LNER Mk4 TSOE 12223 B Coach $ PRICE IN PROGRESS!
Following on from the Mk3 coach, the Mk4s were built between 1989 and 1992 at Metro-Cammell’s Washwood Heath facility for the newly-electrified InterCity 225 services on the East Coast Main Line. A total of 282 carriages were built, to maintain a fleet of 30 fixed formations. Each one comprised of nine vehicles, operating with a Class 91 locomotive and a Driving Van Trailer on the other end to allow trains to operate in both directions without needing to turn the locomotive. The Mk4 is an all-steel design which incorporates a number of improvements over the previous Mk3s. Most-notably, the inclusion of automatic push-button operated plug-type doors in place of the manually-operated slam doors. The body shells, which were built by BREL and Breda in Milan, also have fully sealed gangways and controlled emission toilets (CETs). The coaches were used by successive ECML train operators that followed on from BR InterCity, including GNER, East Coast, and LNER, though they were largely replaced with the arrival of the first Class 801 ‘Azumas’ from 2019/20, with large numbers going to scrap. Following refurbishment, 12 Mk4s were acquired by Transport for Wales for its Holyhead-Cardiff ‘premier’ service, and these were joined by further examples that had been refurbished for a planned London Euston-Blackpool service by Grand Central that never materialised, bringing the TFW fleet up to 37 vehicles. This highly detailed OO gauge model coach is based on ‘TSE’, a Tourist Standard End coach, designed to be positioned next to the locomotive with just one corridor connector. Specification Item Length - Without Packaging (cm): 33 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge License: Yes Gauge: OO Operator: LNER Livery: Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock
Hornby R40497 OO Virgin Intercity Mk3 TRSB 40437 Coach
HORNBY
Hornby R40497 OO Virgin Intercity Mk3 TRSB 40437 Coach $ PRICE IN PROGRESS!
British Rail introduced the production version of the Mk3 coach in 1975 with improved standards of comfort in response to competition from airlines and increased use of private motor cars. Designed and built by BREL, they were initially intended as locomotive-hauled stock, but with the development of the High Speed Train (HST), were soon adapted for use at speeds of up to 125mph (220km/h). The first version of the Mk3 coach had actually been built in 1972, with ten coaches produced for the prototype HST. Mk3 coaches continued to be built until 1988, but multiple units based on the Mk3 body shell were built until the early 1990s. The standard length of a Mk3 coach is 75ft (23m), which is ten feet longer than its predecessor, the Mk2, and is of monocoque construction with an all-welded mild steel stressed skin. Virgin operated several sets of these coaches for use with its HST power cars. Following introduction of its Pendolinos, most of Virgin’s Mk3 coaches moved on to other operators, though it did retain one set for peak time cover and had them refurbished at Doncaster and painted into the same livery as its Pendolino and Voyager trains. However, these too were stood-down in November 2014 when they were transferred to Abellio Greater Anglia. This highly detailed OO gauge coach model is based on ‘TRSB’, a Trailer Restaurant Second Buffet with seating and tables for second class passengers, and a buffet counter.  Specification Item Length - Without Packaging (cm): 30.3 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge Gauge: OO Operator: Virgin Trains Livery: Red/Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock
Hornby R40496 OO Virgin Intercity Mk3 TF 41045 Coach
HORNBY
Hornby R40496 OO Virgin Intercity Mk3 TF 41045 Coach $ PRICE IN PROGRESS!
British Rail introduced the production version of the Mk3 coach in 1975 with improved standards of comfort in response to competition from airlines and increased use of private motor cars. Designed and built by BREL, they were initially intended as locomotive-hauled stock, but with the development of the High Speed Train (HST), were soon adapted for use at speeds of up to 125mph (220km/h). The first version of the Mk3 coach had actually been built in 1972, with ten coaches produced for the prototype HST. Mk3 coaches continued to be built until 1988, but multiple units based on the Mk3 body shell were built until the early 1990s. The standard length of a Mk3 coach is 75ft (23m), which is ten feet longer than its predecessor, the Mk2, and is of monocoque construction with an all-welded mild steel stressed skin. Virgin operated several sets of these coaches for use with its HST power cars. Following introduction of its Pendolinos, most of Virgin’s Mk3 coaches moved on to other operators, though it did retain one set for peak time cover and had them refurbished at Doncaster and painted into the same livery as its Pendolino and Voyager trains. However, these too were stood-down in November 2014 when they were transferred to Abellio Greater Anglia. This highly detailed OO gauge model coach is based on ‘TF’, a Trailer First with open plan seating at tables for first class passengers.  Specification Item Length - Without Packaging (cm): 30.3 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge Gauge: OO Operator: Virgin Trains Livery: Red/Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock
Hornby R40495 OO Virgin Intercity Mk3 TGS 44081 Coach
HORNBY
Hornby R40495 OO Virgin Intercity Mk3 TGS 44081 Coach $ PRICE IN PROGRESS!
British Rail introduced the production version of the Mk3 coach in 1975 with improved standards of comfort in response to competition from airlines and increased use of private motor cars. Designed and built by BREL, they were initially intended as locomotive-hauled stock, but with the development of the High Speed Train (HST), were soon adapted for use at speeds of up to 125mph (220km/h). The first version of the Mk3 coach had actually been built in 1972, with ten coaches produced for the prototype HST. Mk3 coaches continued to be built until 1988, but multiple units based on the Mk3 body shell were built until the early 1990s. The standard length of a Mk3 coach is 75ft (23m), which is ten feet longer than its predecessor, the Mk2, and is of monocoque construction with an all-welded mild steel stressed skin. Virgin operated several sets of these coaches for use with its HST power cars. Following introduction of its Pendolinos, most of Virgin’s Mk3 coaches moved on to other operators, though it did retain one set for peak time cover and had them refurbished at Doncaster and painted into the same livery as its Pendolino and Voyager trains. However, these too were stood-down in November 2014 when they were transferred to Abellio Greater Anglia. This highly detailed OO gauge coach model is based on ‘TGS’, a second class open coach like the ‘TS’ but with a space for the guard’s compartment. Specification Item Length - Without Packaging (cm): 30.3 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge Gauge: OO Operator: Virgin Trains Livery: Red/Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock
Hornby R40494 OO Virgin Intercity Mk3 TS 42175 Coach
HORNBY
Hornby R40494 OO Virgin Intercity Mk3 TS 42175 Coach $ PRICE IN PROGRESS!
British Rail introduced the production version of the Mk3 coach in 1975 with improved standards of comfort in response to competition from airlines and increased use of private motor cars. Designed and built by BREL, they were initially intended as locomotive-hauled stock, but with the development of the High Speed Train (HST), were soon adapted for use at speeds of up to 125mph (220km/h). The first version of the Mk3 coach had actually been built in 1972, with ten coaches produced for the prototype HST. Mk3 coaches continued to be built until 1988, but multiple units based on the Mk3 body shell were built until the early 1990s. The standard length of a Mk3 coach is 75ft (23m), which is ten feet longer than its predecessor, the Mk2, and is of monocoque construction with an all-welded mild steel stressed skin. Virgin operated several sets of these coaches for use with its HST power cars. Following introduction of its Pendolinos, most of Virgin’s Mk3 coaches moved on to other operators, though it did retain one set for peak time cover and had them refurbished at Doncaster and painted into the same livery as its Pendolino and Voyager trains. However, these too were stood-down in November 2014 when they were transferred to Abellio Greater Anglia. This highly detailed OO gauge model coach is based on the ‘TS’, a Trailer Second coach with an open plan seating area for second class passengers. Specification Item Length - Without Packaging (cm): 30.3 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge Gauge: OO Operator: Virgin Trains Livery: Red/Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock
Hornby R40480 OO LNER 'West Riding Limited' Open Third & Brake Third Coach pack Hornby R40480 OO LNER 'West Riding Limited' Open Third & Brake Third Coach pack
HORNBY
Hornby R40480 OO LNER 'West Riding Limited' Open Third & Brake Third Coach pack $ PRICE IN PROGRESS!
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier. Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station. The final pair are made up of an open third class coach with lavatory, plus another third class brake coach with alternative accommodation for the train’s guard, and these are the highly detailed OO gauge model coaches shown in this pack. Specification Item Length - Without Packaging (cm): 33 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge License: Yes Gauge: OO Operator: LNER Livery: Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock Contents 2x Model Passenger Coach, 1x Accessory Pack
Hornby R40479 OO LNER 'West Riding Limited' Open Third & Kitchen Third Coach Pack Hornby R40479 OO LNER 'West Riding Limited' Open Third & Kitchen Third Coach Pack
HORNBY
Hornby R40479 OO LNER 'West Riding Limited' Open Third & Kitchen Third Coach Pack $ PRICE IN PROGRESS!
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross, Leeds and Bradford, in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, and was named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier. Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station. Vehicles ‘E’ and ‘F’ include a Third Class Open Coach and a another coach with third class seating and a second kitchen area. These highly detailed OO gauge LNER coaches are excellent replicas of the 'West Riding Limited' carriages.Contents 2x Model Passenger Coach, 1x Accessory Pack
Hornby R40478 OO LNER 'West Riding Limited' Double Open First Coach pack Hornby R40478 OO LNER 'West Riding Limited' Double Open First Coach pack
HORNBY
Hornby R40478 OO LNER 'West Riding Limited' Double Open First Coach pack $ PRICE IN PROGRESS!
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier. Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station. The next vehicles in the rake are coaches ‘C’ and ‘D’ and these comprise of two identical first class open coaches which offered enhanced comfort and also had a lavatory at each end. These coaches are the ones presented in this highly detail OO gauge coach pack. Specification Item Length - Without Packaging (cm): 33 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge License: Yes Gauge: OO Operator: LNER Livery: Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock Contents 2x Model Passenger Coach, 1x Accessory Pack
Hornby R40477 OO LNER 'West Riding Limited' Brake Third & Kitchen Third Coach pack Hornby R40477 OO LNER 'West Riding Limited' Brake Third & Kitchen Third Coach pack
HORNBY
Hornby R40477 OO LNER 'West Riding Limited' Brake Third & Kitchen Third Coach pack $ PRICE IN PROGRESS!
Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937. A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, and named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality. The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier. Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station. The carriages are in pairs, sharing a bogie between the two. Coaches ‘A’ and ‘B’ in the eight-coach rake include an open third brake with accommodation for the guard, and a coach with a further third class area plus kitchen. These are the highly detailed OO gauge model coaches shown in this pack. Specification Item Length - Without Packaging (cm): 33 Item Height - Without Packaging (cm): 5 Item Width - Without Packaging (cm): 3.5 Item Scale: 1:76 Scale 00 Gauge License: Yes Gauge: OO Operator: LNER Livery: Grey Minimum Curve (mm): Radius 2 Buffer Type: No Buffers Coupling Type: NEM Tension Lock Contents 2x Model Passenger Coach, 1x Accessory Pack
Kato 10-1591 Series 20 Sleeper Train 7 Car Set Kato 10-1591 Series 20 Sleeper Train 7 Car Set
KATO
Kato 10-1591 Series 20 Sleeper Train 7 Car Set $309.95
This standard 20-series product allows you to enjoy the prestigious sleeping train of yesteryear. Combine a passenger and a locomotive to recreate a comfortable sleeping train Combined with the 7010-1 DD54 Blue Rain Tower, you can enjoy the "Izumo" of the bedside express Features The Nahanev 23 pass-through door is reproduced in silver. Attaches the included body mount coupler Represents the interior of the caboose chamber of a low speed ride. See through Reproduces crushable waste disposal equipment under the car end floor. The end of the crab 21 and Nahanev 22 locomotive uses a body mount coupler. Arnold Coupler Standard Equipment with Replacement Knuckle Coupler Both intermediate connecting surfaces are made with the KATO Coupler N JP B. Tail Light/Back Sign On. Nahanev 23 has a light off switch. LED light unit provides low voltage to bright light The beautiful finish of the plastic molding (crab 21, Nahanev 22) has a streamlined roof shape. Beautiful color of the blue No. 15 body color, and 3 cream No. 1 narrow belts are used. The side destination direction is represented with white parts. The bed of a B sleeper, an open A-sleeping carrier, and a dining room car table, and a full variety of indoor expressions. The product has been carefully reproduced under floor equipment such as coolers, water tanks, air tanks, and plumbing. Backsign included. Izumo, Seto, Akebono, and Asakase Contents Crab 21 11 Narone 21 129 Nathan 20 231 Pear 20 5 Nahanev 23 6 Nathan 20 248 Nahanev 22 7